Press Releases

Channel Closures for B.B. McCormick Bridge Construction

The channel at the B.B. McCormick bridge located at mile marker 747, on the ICW will be closed 7 a.m. thru noon and 1 p.m. to 5 p.m. until Friday, March 20, 2009.

The channel at mile marker 747, on the Intracoastal Waterway at the B.B. McCormick bridge will be closed for the demolition of the old bridge.

Scheduled Closures:

Start Date: January 21, 20009  End Date: March 20, 2009

Closures Times:  Monday through Friday, 7 a.m. to noon and 1 p.m. to 5 p.m.

The channel is open during the weekends and after 5 p.m.  Mariners should contact Jeremy of Superior Construction, Inc., at (904) 223-5076 for additional information on construction schedules.