The Recovery Act


The Recovery Act

The American Recovery and Reinvestment Act of 2009 is a newly created effort by the United States government to jumpstart our nation’s economy by creating and saving millions of jobs and addressing long-standing challenges. The Act provides for never-before-seen levels of transparency and accountability so you’ll know how, when and where your tax dollars are being spent. The American Recovery and Reinvestment Act also includes built-in metrics to dispel waste, inefficiency and unnecessary spending. Jacksonville Transportation Authority (JTA) is ready to put these stimulus dollars to work in Northeast Florida to improve and grow mass transit services and design and construct bridges and highways. 

You will now be able to see JTA grants and projects that will allow us to enhance our services, expand our capabilities and continue to serve the growing Northeast Florida region. Major planned investments include new roadways and bridge enhancements to existing traffic corridors, energy-efficient hybrid cooling systems and and also biometric access systems for protection of critical transportation facilities. Be sure to check back often for updates

Related links:

http://www.fta.dot.gov/civilrights/civil_rights_9311.html   ARRA and Civil Rights page
http://www.fta.dot.gov/civil_rights.html Civil Rights and Accessibility page as well as the individual program pages for ADA, Title VI, DBE and EEO
http://www.recovery.gov/

Click here to see the projects that the Jacksonville Transportation Authority has applied for. 

 

ARRA-Funded Projects

Project Description Budget Mode/Program
Highway Alta Drive Resurfacing (Design Build)

3,558,883

Highway

Rosa L. Parks Station Security Guards To improve passenger safety

862,0047

Security

Operating Assistance for Route SS6 To provide bus service to the Beach Blvd., Town Center and UNF commuities

1,079,943

 

Cummins Engine Retrofit The 2003 (24) and 2004 (21) Gillig buses have significant mileage and will require engine overhaul or replacement

1,795,544

Bus

Nova/RTS Body Panel Replacement Kits This project will upgrade the security of the access panels and enhance the appearance of the buses.

50,590

Bus

Portable Vehicle Lifts To acquire vehicle lifts needed for new P.M. Inspections bays in Maintenance Annex.

60,000

Bus

Platform Edges Replace platform edges that are damaged or have excessive wear

48,758

Skyway

Station Stairs Repair damaged stairs at three stations (Convention, Jefferson, and Central).

144,598

Skyway

Verticle Transportation To replace 20-year old escalators

390,000

Skyway

Guideway Rail Components Replacement of elements for ground/signal and power rails including installation of related components

78,645 

Skyway

Guideway Switch Actuators Programmed maintenance replacement of switch beam actuators for 4-year overhaul

57,999

Skyway

Hybrid Electric Cooling System (EMP) System will eliminate bus hydraulic cooling leaks, reduce overheating issues, reduce vehicle weight by approximately 300 lbs.

1,275,000

Bus

Thermo King HVAC Motor Replacement Kits To replace and upgrade the evaporator and condensor bus HVAC motors rather than overhaul the current old motors.

287,866

Energy

Fare Collection System To install modern fare collection equipment in bus fleet .

4,375,000

Mass Transit

Paving Installation New Areas - JTA Parking Lot Expansion Parking lot expansion to accommodate employee parking which will allow improved site security, and provide adequate visitor parking and repair current parking area

526,255

 

Philips Highway Park & Ride Lot Maintenance & Improvement Add new access, signal, re-striping and rehab/renovate to Philips Highway/ Butler Blvd. P & R Lot

351,494

 

Park & Ride Lot Maintenance & Improvement Repair/resurfacing, striping and maintenance of downtown, and other Park and Ride lots

105,678

 

Skyway Fare Collection System Replace portions of the current fare collection system which is 20-years old.

250,000

 

Paratransit and Community Vehicles Purchase community shuttle vehicles to replace units that have exceeded their useful life or are needed for expanded/ modified service areas.

1,423,745

 

Brake Shop Roof Replacement Brake Shop Roof Replacement

57,828

 

Maintenance Building Roof Replacement Maintenance Building Roof Replacement

470,000

 

Car Key Control System for all of JTA Pool Cars To provide security control for all JTA pool car keys

9,000

Security

One 2009 Chevrolet Tahoe SUV Purchase replacement vehicle for security

24,748

Security

Cameras along Fence Line at Myrtle Ave Property To provide additional perimeter protection for the JTA bus operations facility at Myrtle Ave.

60,005

Security

Enclosed, Secure Area for Lost & Found Staff To provide added protection to the JTA Lost and Found staff

19,995 

Security

Landscaping & Irrigation Services To provide maintenance and beautification to JTA properties

199,727

Enhancement

Replacement Buses To reduce emissions

3,099,143

Bus

Bus Shelters To add to the inventory of existing bus shelters

250,000

Passenger Amenities

 Solar Lighting for Bus Shelters To increase safety

100,000

Security

Administrative Office Trailer Additions To provide temporary office and conference room space for JTA

850,000

 

Clean up of Maintenance Facility To rehabilitate property

0

Enhancement

Security Equipment for Bus Shelters To enhance passenger safety

79,850

Security

Regional Park and Ride Hub To develop a new park and ride

982,450

 

Replace and Upgrade Guideway Rail Hangers Replace Guideway rail hangers with upgraded units  

36,559

 Skyway



Additional Information

All Projects
Development Projects
Mass Transit Projects
Planning Projects
Roadway Projects
Archived Projects


Traffic and Transit Info

For information on Traffic reports from 511
click here

Title VI Program Policy


Program Policy
Title VI Complaint Form
Title VI Policy Statement


Special Accommodations

Special accommodations such as Braille and large print of all JTA printed documents are available upon request.

Contact Customer Service at (904) 630-3100 with your request. Please allow 7-10 days for processing.