CSX repair work to the railroad crossing on Edgewood at Beaver will continue July 27-31. Both lanes of Edgewood will be closed between Cassat Ave. and Beaver St. The only bus route that will be affected is Route 51, which will be on detour. No bus stops will be missed. However, heavy traffic delays are expected.

SR 9B - US1 to I-95


Better Jacksonville Plan, BJP-2
Status Report is for May 2013

This is a rendered view of SR 9B - US 1 to I-95 project. For more information call  630-3181.

 

DESCRIPTION: Project includes partial interchange with I-95, an interchange with Philips Highway and a bridge over the FEC railroad tracks.

STATUS
Current Activity: DESIGN PHASE: FDOT has completed 90% design.  The project will be let as a single Design-Build-Finance contract, which will complete the connection from Philips Highway (US-1) to I-95.

Funding: FDOT has 100% of the funding for final design and right-of-way acquisition.  Although the BJP-SPP Program allocates $15 million to this project, BJP funding is not available to support that allocation.  

Schedule:
The Design-Build-Finance team is scheduled to be selected in July 2012.  The team will complete project design, construct the facility and finance the construction.  The Department will reimburse the contractor when the project appears in our Work Program in FY2014/2015.

DBE/MBE: DBE participation will conform with FDOT policies.

SIGNIFICANT ISSUES:
None.

PROJECT MANAGER: Florida Department of Transportation (FDOT)

CONTACT:
Wendy Morrow, (904) 598-8733